The core rule
Any house built before 1978 is assumed to contain lead paint unless proven otherwise.
If a child under six will live or continue to live in a home built before 1978, the owner must have the home either deleaded or brought into Interim Control within 90 days of taking title.
Read that again. Not eventually. Not when convenient. Within ninety days of taking title, and the obligation is the new owner's.
What has to happen before you sign
Under both Massachusetts and federal law, every seller and any real estate agent involved must give you the Property Transfer Lead Paint Notification before the signing of a purchase and sale agreement, a lease with an option to purchase, or a memorandum of agreement used in foreclosure sales.
They must also:
- Provide copies of any lead inspection reports, risk assessment reports, Letters of Compliance, or Letters of Interim Control
- Tell you anything they know about lead in the home
- Tell you about the 90-day obligation
- Sign, and have you sign, the certification page
The state updated the Property Transfer Lead Paint Notification and the Tenant Lead Law Notification as of April 2026, improving clarity and accessibility. If your agent is working off a form from two years ago, that is a signal about the rest of their file.
There is also a public resource almost nobody uses: the Childhood Lead Poisoning Prevention Program posts lead inspection histories on its Lead Safe Homes database. You can look up a property before you ever ask the seller.
The two letters, and what each is worth
Letter of Full Compliance. A licensed inspector has certified that lead hazards have been removed or contained in all accessible areas. This is the outcome you want. It is also worth a Massachusetts tax credit equal to the cost of deleading or $3,000 per unit, whichever is less.
Letter of Interim Control. A lower standard — hazards managed rather than eliminated. Worth a credit of up to $1,000, which applies toward the $3,000 limit. Interim Control requires annual renewal, and after two years the property must achieve full compliance if a child under six still lives there. That renewal requirement catches owners off guard constantly.
What it costs
Targeted component work can run a few thousand dollars. A full unit abatement runs well over $10,000. Broader estimates for a Massachusetts home run $5,000 to $20,000 depending on scope.
Consider a typical triple-decker with something like fifty windows. Before 1978, window frames and sills were routinely finished with lead-based products, which is why windows dominate the cost. Deleading a building like that is expensive and highly disruptive, and often requires residents to move out temporarily.
A $3,000 credit against a $12,000 job is real help and not a solution. Only about ten percent of Massachusetts dwellings have been deleaded.
The financing nobody mentions
Get the Lead Out provides low-cost financing to owners of one-to-four-family properties. Maximum loan amounts: $30,000 single-family, $35,000 two-family, $40,000 three-family, $45,000 four-family. For owner-occupants meeting income guidelines, zero-percent deferred-payment loans are available — not due until sale, transfer, or refinance.
There is also a path through FHA 203(k), which lets a buyer finance deleading inside a single loan with the mortgage, based on after-rehab value. One-to-four family only, minimum $5,000 in repairs.
And local Community Development or Planning offices frequently run their own programs through CDBG and HOME funds.
If you are buying a pre-1978 property with children, ask your lender about these before you structure the purchase, not after.
If you are a landlord
The obligations are broader and the penalties are serious.
You must remove or control lead hazards in any unit where a child under six will reside, regardless of whether the paint appears to be in good condition. You must provide the Tenant Lead Law Notification and Certification Form and the EPA lead safety brochure, plus copies of any compliance or inspection records — to every tenant, whether or not they have a young child.
What you cannot do: ask tenants to waive their lead rights, or refuse to rent to families with children under six. That refusal is housing discrimination, and it carries fines, lawsuits, and potential criminal penalties.
If deleading requires tenants to relocate, the landlord is responsible for reasonable moving costs and temporary housing costs above the normal rent, with the tenant continuing to pay their normal rent as their share.
The renovation trap
Homeowners doing their own work in a property they occupy are generally exempt from the federal RRP certification requirement — but the exemption disappears if a child under six lives in the home.
Given the overlap between federal RRP rules and Massachusetts deleading requirements, the safe path for any significant renovation of a pre-1978 Massachusetts home is a licensed deleader holding both state and EPA credentials.
What to actually do
- Check the build year first. Pre-1978 means all of this applies.
- Search the Lead Safe Homes database before you write an offer.
- Ask for the Letter of Compliance. A renovated kitchen does not mean a home has been deleaded. New paint does not mean old lead paint is gone.
- If there is no letter, get a licensed inspection during your contingency period and price the work.
- If a child under six will live there, calendar the 90 days from closing.
- Ask your lender about Get the Lead Out and 203(k) before you structure financing.
The reason this matters more than buyers think: it is not a disclosure item you acknowledge and move past. It is an affirmative obligation with a deadline, attached to a category of housing that describes most of Greater Boston.
Send me the address of anything you are considering and I will tell you what the build year implies, what to request, and what I would budget. If you have young children and you are shopping pre-1978 housing, this belongs in the conversation before you fall in love with a property.
Chris Remmes, Managing Broker, Remmes & Co. [email protected] | 617-398-0015